The time has come for British Columbia to create its own robust housing development agency.
In the last instalment of this series on fixing the housing crisis, we followed the money, and it led us to a casino. The cost of capital, more than lumber or labour, decides who gets housed, and Canada’s financing system for housing steers that capital toward speculation, away from housing factories and increasingly out of the country.
This article and one tomorrow deal with what to do about it — including opportunities for action at the provincial and municipal levels rather than expecting Ottawa alone to create the required new pieces.
Vancouver presents a world-class challenge
By one measure, Vancouver is already world-class. The Economist Intelligence Unit’s latest global livability index ranks it ninth in the world, weighing stability, health care, culture and infrastructure, but not what it costs to live there. Vancouver-based journalist Justin McElroy, whose new book Searching for the Best Place on Earth recounts a year spent visiting 52 countries, came home with a different definition of a world-class city: one where everyone who lives there can do so in reasonable comfort.
Nowhere, McElroy wrote in the Globe and Mail, did he see anything like Vancouver’s Downtown Eastside, which he called a “world-class concentration of human suffering.”
Copenhagen, which ranks first in the same index, made a different decision about who builds housing. Roughly half its households live in social, non-profit or co-operative housing. Singapore’s public developer houses almost four in five residents. In London and Paris, the share is above 20 per cent.
In Metro Vancouver, public and non-profit housing is about five per cent of the stock, and in Canada it is about four per cent, roughly half the Organization for Economic Co-operation and Development average.
The measures and models vary, but a gap that size cannot be explained away with footnotes. Closing it is a job for institutions, and the key question is which government is best placed to lead.
Every federal housing argument eventually hits the same wall, and the critics who point it out are right. Ottawa’s direct authority runs only to the land it owns. Zoning and land use belong to municipalities, and municipalities are creatures of the provinces. A federal Crown corporation cannot rezone a parcel in Burnaby, and it cannot compel anyone else to do so.
So even the best federal outcome, a properly capitalized Build Canada Homes with political will and a standing mandate, arrives at a jurisdictional boundary that British Columbia and the other provinces are already standing on the other side of. The province holds the land authority. What it has not built is the institution designed to use it.
A word on where I stand. As I noted in the first instalment of this series, my firm partners with BC Housing on a rental and social housing project in Vancouver. I have also informally advised policymakers at different levels of government, and politicians across parties, often recommending the policies I outline here, and I have been asked in the past whether I would help build the kind of institution I am arguing for. I have not ruled it out. Given my own family’s history, this work matters to me. Housing for every person in our communities should not be a partisan issue, and this is not a partisan argument. Read what follows accordingly.
What Ottawa built, and what it left out
As the previous article in this series explained, the Build Canada Homes Act gave the new federal Crown corporation every power a developer has, but not a balance sheet. The Nov. 5 federal budget brings its total capitalization to $45 billion. Section 30 of the act still caps everything it may borrow from anyone other than Ottawa at $400 million, less than one per cent of that total. That is not a balance sheet. It is an allowance, however generous.
A corporation that cannot borrow against the homes it builds cannot create the asset large pools of patient capital actually buy: long-duration, inflation-linked, backed by homes, and boring in the way the largest institutional investors like things to be boring. It cannot bring co-investors alongside or recycle proceeds into the next project. It can spend only what it is given, once.
A Build Canada Homes that kept what it built could do what every rental owner does: borrow against the homes and their rents, even conservatively at half their value, and put that money into the next project. Cabinet could raise the ceiling by order-in-council.
The capital is there, but much of it is leaving. Canadian pension funds do build rental housing at home, but CPP Investments, the largest, now holds just 12 per cent of its portfolio in Canada, down from 74 per cent in 2005. Canadian pension money is building rental housing in Britain instead.
The financial expertise is there too. The Canada Mortgage and Housing Corp. has underwritten housing at scale since 1946, and its loan programs remain the largest single source of construction capital in the country. But it lends against housing someone else owns and operates. It is a counterparty to the market, not a principal in it. The Canada Infrastructure Bank lends against the pipes under a development, not the building on top, and the new $25-billion Canada Strong Fund has yet to be pointed at housing at all. What Canada lacks are domestic vehicles that can put that money to work.
And even a fully capitalized Build Canada Homes would still need someone to deliver on land Ottawa does not control. That is the provinces’ job. But British Columbia has yet to build the institution to do this. Ottawa’s budget now aims to triple the pace of non-market housing starts. It cannot do that at the scale required without the provinces.
The lesson of Singapore
On May 25, 1961, a fire swept through the Bukit Ho Swee squatter settlement in Singapore, leaving 16,000 people homeless overnight. It was more than a housing crisis. It was a humanitarian catastrophe, and an existential test for a self-governing territory that would not become fully independent until 1965. The fire came barely 16 months after the colonial-era Singapore Improvement Trust was replaced, on Feb. 1, 1960, by the new Housing and Development Board, or HDB. Had it struck two years earlier, the trust would likely have responded the way many traditional public bureaucracies do: commissioning studies, entangling itself in its own red tape and running out of money before solving the problem.
Instead, the year-old HDB treated it like a wartime mobilization, much as Canada’s Wartime Housing Ltd. had during the Second World War. Within 12 months, it had built thousands of flats and rehoused the victims.
The difference was not just a name change. It was a fundamental change in governance, management and culture.
Lee Kuan Yew, Singapore’s then-prime minister, had no patience for the colonial-era status quo, and he knew that culture comes from the top, so he chose not to put a career civil servant in charge. He appointed as HDB’s first chairman Lim Kim San, a self-made millionaire known for his “rough and ready” management style and a pragmatism that put results ahead of procedural comfort.
Lim insisted on speed and a “must do” ethos. He did not limit his oversight to reading reports and chairing meetings. He walked construction sites, checking electrical wiring and inspecting plumbing like a factory owner auditing an assembly line. Under his leadership, HDB completed its first five-year building program with more than 54,000 units, a scale the Singapore Improvement Trust had never approached in three decades of trying.
Same country, same constraints, same capital markets. Different institution, different mandate, different management. And, ultimately, different outcomes.
The Singapore Improvement Trust is worth understanding, because its failure is the closest historical analogue to the structure British Columbia is running now. It was neither incompetent nor unmotivated. Established in 1927, it built real housing. What it lacked was the authority and the financial architecture to work at the scale the problem demanded. Its revenue came from a property levy, discretionary government grants and rents, and by the late 1940s those no longer covered the cost of what it was building, leaving it dependent on loans and permanently behind.
A government committee recommended in 1948 that the trust’s housing function be taken over. By the mid-1950s the recommendation was to scrap it.
Beyond subsidized housing
Deeply subsidized housing, the kind most North Americans picture when they hear “public housing,” runs on different arithmetic: every door requires an operating subsidy that never ends. That is not a criticism of social housing. It is why that model can never be the whole answer, and why a middle-income developer needs a different management structure and its own balance sheet.
BC Housing was built to administer social and supportive housing, a vital, specialized and immensely important undertaking that calls for a completely different ethos from that of commercial development of middle-income housing.
Subsidy administration optimizes for compliance, fair allocation and the avoidance of loss. Middle-income development optimizes for speed, underwriting judgment and returns sufficient to cover its cost of capital and recycle into the next project. The first is a grant function; the second is an equity function. They require different governance, different reporting, different focus, different commercial skills and different tolerances for risk.
Housing a commercial development arm inside a subsidy administrator is a governance problem with a measurable cost: slower decisions, risk aversion priced into every deal, and an inability to compete for the real estate and finance professionals with the market instincts to actually underwrite a project.
When a single organization is asked to fight homelessness, manage subsidized rentals and act as a commercial equity developer at the same time, its mandate is diluted. If everything is a priority, nothing is a priority, and nothing is done well. Keep a development arm inside a compliance-first agency with no balance sheet of its own, and it converges on the Singapore Improvement Trust’s outcome for many of the same reasons.
British Columbia does not have a squatter fire, but it has an institutional design problem of exactly this shape. The province has been edging toward becoming a middle-income developer for nearly a decade. BC Housing launched HousingHub in April 2018 to tackle the “missing middle,” a gap every party acknowledged, and that initiative later became BC Builds. It still sits inside BC Housing. It should be moved out and reconstituted as a stand-alone, commercially governed public developer with its own board and its own balance sheet.
Learning from Whistler
The Whistler Housing Authority has spent 30 years running a price-restricted portfolio of roughly 1,000 ownership and rental units, where resale prices are tied by covenant to inflation rather than to the market around them. In one of the most expensive resort markets on Earth, largely because of the authority’s homes and programs, about 84 per cent of Whistler’s workforce lives in Whistler, against a policy target of 75. The province’s own first attempt at the model, 104 rental homes on Whistler’s Mount Fee Road in 2024, got the mechanics right but not the scale.
A 104-unit project is a pilot. British Columbia does not need a pilot. It needs a public developer built for the size of the problem.
The opportunity is already sitting in finished buildings. As we noted last time, the Canada Mortgage and Housing Corp. counted a record 4,376 completed, unsold condos in the Vancouver area in May, up 76 per cent in a year. Andy Yan of Simon Fraser University’s City Program says the region has not seen inventory sit like this since the mid-1990s. By the end of September, Real Property Data counted 5,770 completed, unsold condos across the Lower Mainland. And the fall 2026 Rennie Landscape report counts 14,264 unsold new condos in Metro Vancouver at every stage, more than half of them still under construction, so the backlog of finished units will keep growing.
Meanwhile, condo starts have fallen sharply and purpose-built rental starts have overtaken them. The market is behaving rationally and has stopped producing homes it cannot sell, which means the ownership stock this region will have in 2030 is being decided now.
These are not projects waiting on a rezoning. They are finished homes standing empty in a market that is not clearing.
Rennie’s chief economist, Ryan Berlin, names the transaction that would change the picture: “take-out buyers” purchasing unsold inventory in bulk and moving it into rental. “If that happens here,” he says, “because it hasn’t yet, then you could see these headline numbers change dramatically.”
In Ontario, it is already happening. Investment groups bought 45 per cent of all new condos sold in the Toronto region in the third quarter of 2026, according to the research firm Urbanation, as builders cut prices to clear inventory. Doug Ford’s Progressive Conservative government has put public capital to work alongside them.
In March, the Building Ontario Fund committed $300 million, mostly as a repayable loan with a small equity stake, to a High Art Capital initiative converting about 2,200 unsold Greater Toronto Area condos into rentals, about 550 of them affordable. The initiative expects to raise roughly $733 million more from other lenders. Structured properly, public capital draws private capital in.
The discount is real, and someone is going to capture it. A private fund will rent the units out and sell them later for a capital gain. Yan raises the harder question: “It’s housing for whom?”
Most of the available units are not the “shoeboxes” some commentators assume. More than 60 per cent of the Lower Mainland’s completed, unsold condos have two or more bedrooms, according to Real Property Data figures reported by the Globe and Mail. They are the homes young families need, priced for a market that has moved on.
The creation of a public developer answers Yan’s question by changing the price at which those homes enter someone’s life. The middle-income buyer acquires the home from the public developer at a cost the market will not offer again and keeps the asset. Home ownership is made available to service workers, teachers and nurses like Julie whom I have previously written about.
The particular powers of a public developer
Markets work best where supply can respond quickly to price. Housing supply cannot. A project takes years from land to keys, and much of that delay is government-made. So private developers rationally build in the up cycle and pull back in the down cycle, when financing and pre-sales dry up. That is the right decision for each firm, and often the only one, but the wrong outcome for a province with a structural shortage. By the time the next wave of supply arrives, prices have already run.
A public developer with a long-term mandate can keep building through the cycle, hold the trades workforce together and buy construction capacity when it is cheapest.
That is counter-cyclical acquisition: buying when the market is not clearing, the only moment these assets are cheap. The industry’s own remedies point the other way. Expanded GST rebates, rental property held in registered retirement savings plans and looser foreign-buyer rules all aim to find a private buyer at something close to the original price. The Nov. 5 federal budget took another step down that well-trodden path, moving to exempt new homes from the foreign-buyer ban, to unlock what it calls “additional investment in new housing supply.”
By contrast, public acquisition uses the discount instead of erasing it, and the public keeps the asset. But this requires an institution with the authority to move in weeks rather than budget cycles.
And budget cycles are not a hypothetical constraint. On Feb. 17 this year, the provincial budget cancelled the July 2025 intake of the Community Housing Fund and delayed progress on the Indigenous Housing Fund. The BC Non-Profit Housing Association surveyed its members and reported 49 projects affected, more than 4,000 homes at risk and at least $21 million spent on pre-development work that may now produce nothing.
So, we have nearly 5,800 finished condos nobody seems able to buy, about 8,000 more under construction with no buyers yet and more than 4,000 homes that may never be built. Different failures, the same missing institution.
Every government faces this. A budget under pressure cuts what is easiest to cut, and a discretionary item is always the easiest thing to cut. An agency with its own capital, its own board and a financeable asset book is harder to switch off, because switching it off means liquidating something the province owns.
The province has the land and the need. What it lacks is the institution. Victoria should move BC Builds out of BC Housing, give it a commercial board and a balance sheet of its own, and let it use the province’s powers and the lower borrowing costs available only to governments to buy homes below replacement cost and build new ones that middle-income households can afford.
B.C.'s new government, led by Premier Lorne Doerkson, has folded housing into a new Ministry of Local Government, Housing, Sport and Culture under Saanich South MLA Cathie Ounsted, with Surrey City Centre MLA Zeeshan Wahla as minister of state for housing. Together, they have a rare chance to build this institution without dismantling anything that works. Tomorrow's instalment in this series takes up how to build a provincial public developer, how to pay for it and how to respond to the objection private developers are likely to raise. ![]()
Read more: Housing

Tyee Commenting Guidelines
Please note that email notifications for replies are not currently working due to a software issue which may be resolved in a future update.
Comments that violate guidelines risk being deleted, and violations may result in a temporary or permanent user ban. Maintain the spirit of good conversation to stay in the discussion and be patient with moderators. Comments are reviewed regularly but not in real time.
Do:
Do not: